Frequently asked questions

01 What condition will the apartments be handed over in?

Apartments will be handed in the green frame condition, where:

 

  • Aluminum doors and windows are installed on the perimeter of the building; 
  • Main entrance iron door to the apartment installed; 
  • Walls built with blocks and plastered with “GIPER” on the inner perimeter of the apartment; 
  • The dividing walls between the rooms are arranged with pumice blocks and the dividing walls between the apartments and the corridor are arranged with ceramic blocks;
  • Electrical wiring brought to every room, with electricity distribution points (without switches and sockets); 
  • Water and sewage pipes brought to the sanitary points in the apartment;
  • Internet and TV cables brought to the apartment;
  • Natural gas brought to the apartment;
  • Laid pipes of the heating system;
  • lined balconies, with metal and  laminated tempered glass railings;
  • Stretched floors; 
  • Intercom system.
     

02 What payment terms do you offer?

You can purchase an apartment in the “Roomix Tsintsadze” project through a single payment, internal installment plan, or a mortgage loan with our partner, TBC Bank.

 

INTERNAL INSTALLMENT:

 

  • 20% Down payment
  • 10%  Installment until construction completion
  • 70% Payable upon completion of the project
     

03 When will the project be completed?

The project will be completed by the end of June 2025.